Seabridge Gold Expansion Camp Installation
Project Location
Bell ll, BC
Project Date
Q2 - Q3 2023
Project Scope
- Camp Size: Three (3) – 30-Bed Skidded Dorms, 5-Unit Kitchen/Diner Complex, 2-Unit Recreation Complex, Three (3) Arctic Corridors.
- Project TRIF Rating: 0.00
Project Description
- This project was executed near Bell 2, British Columbia to support initial construction activities for Seabridge Gold, providing additional capacity to the camp installed in 2022.
- Karve was contracted to complete the architectural and structural scopes on this project.