Seabridge Gold Expansion Camp Installation

Project Location

Bell ll, BC

Project Date

Q2 - Q3 2023

Project Scope
  • Camp Size: Three (3) – 30-Bed Skidded Dorms, 5-Unit Kitchen/Diner Complex, 2-Unit Recreation Complex, Three (3) Arctic Corridors.
  • Project TRIF Rating: 0.00
Project Description
  • This project was executed near Bell 2, British Columbia to support initial construction activities for Seabridge Gold, providing additional capacity to the camp installed in 2022.
  • Karve was contracted to complete the architectural and structural scopes on this project.