All Projects
High Level Dene Tha Fire Camp Installation
Project Location
High Level, AB
Project Date
Q2 - Q3 2023
Project Description
- The installation of this camp in High Level, AB for the purpose of serving as an emergency shelter for those displaced by the 2023 wildfires.
- Project was executed with two-week’s notice in under 90 days.
- Camp Size: Two (2) Two-Story Dorms, Four (4) 36-Bed Skidded Dorms, 35-Unit Kitchen Diner, 13-Unit Recreation Complex, Eight (8) Arctic Corridors Modules, and 24 Single Unit Wet Sleepers
- Project TRIF Rating: 0.00