All Projects

TMEP Blue River Camp Installation

Project Location

BC Interrior

Project Date

Q1 - Q2 2022

Project Scope
  • Camp Size:
    • Phase 1: 37-Bed Frameless Dorm, Two (2) – 38-Bed Skidded Dorms, 36-Bed Skidded Dorm, 18-Unit Kitchen/Diner Complex, 9-Unit Check-in Complex, 8-Unit Recreation Complex, 2-Unit Occupational Health Clinic, 12×60 Rapid Antigen Detection Trailer, Two (2) – 12×16 Security Offices.
    • Phase 2: Two (2) – 38-Bed Frameless Dorms, Two (2) – 36-Bed Skidded Dorms.
    • Phase 3: Six (6) – 36-Bed Skidded Dorms, 38-Bed Skidded Dorm, 5-Unit Frameless Lounge Complex.
  • Project TRIF Rating: 0.00
Project Description
  • This project was executed in the interior of BC to support the Trans Mountain Pipeline project.