Project Scope

For this turn key project located in Geraldton, Ontario, Karve Builders provided the craning and installation of 33 Frameless Units units plus 2 units made of prefab floor, roof, and walls onto a foundation consisting of screw piles and structural steel. Complete exterior seal up and finishing. Includes roof insulation and membrane, parapet, transitions, joiners, and flashing. Complete interior seal up and finishing. Includes carpet flooring, wall joiners, roof joiners, transitions, thresholds, and trim, install baskets and lockers.
Installation of domestic water lines and interconnect modules as well supply and install water mains to each facility from water supply and provide heat tracing. Supply required management, labor, materials, and associated goods to ensure the successful electrical installation of the assets as well as install all electrical interconnects between modules.