IAM Gold

Project Overview

The IAM Gold project located near Gogama, Ontario was comprised of 4 phases. The overall project schedule duration was approximately 20 months with the installation and dismantle of approximately 750 modules that were procured from across North America.

 

Phase 1: Chester Camp

The scope for this phase was to install the following assets and infrastructure required to support the camp.

  • 10 Unit Kitchen Diner
  • 6 x 44 Bed Dorms
  • 3 Unit Admin Office
  • 6 Unit Recreation
  • 12’ x 60’ office
  • Water/Wastewater Storage and underground distribution
  • Electrical Generation and distribution
  • Covered elevated Sidewalks

 

Phase 2: Henday Dorm Dismantle

The second phase of the project entailed dismantling eight multi-story permanent modular dorm accommodations, corridors and a maintenance building and all associated utilities and services.  This scope was completed 2 hours north of Fort McMurray where the assets were dismantled, securely wrapped for transportation and shipped across Canada to Gogama.

  • 8 – 3-storey dorms
  • 1 – 7-unit Maintenance Building
  • 12 corridors

 

Phase 3: Pioneer Camp Installation

The third phase of the project was to install an additional 7 dorms a 15-unit kitchen, 5 unit recreation facility and 12 corridors and all associated utilities and services.  T

  • 15 Unit Kitchen Diner
  • 7 x 44 Bed Dorms
  • 5 Unit Recreation
  • Corridors
  • Water/Wastewater Storage and underground distribution
  • Electrical Generation and distribution

 

Phase 4 – Permanent Camp Installation

The last phase of the project was to re-install the eight three-storey dorms, the maintenance building, recreation facility, and arctic corridors.  All of the dorm and kitchen assets were placed onto an above ground triodetic foundation with the remaining assets placed on to a traditional wood blocking foundation.

  • 8 – 3 story dorms
  • 24 Unit Kitchen
  • 15 Unit Recreation Facility
  • 1 – 7-unit Maintenance Building
  • Water/Wastewater Storage and underground distribution
  • Electrical Generation and distribution
  • 6 – corridors

 

Other Notable Projects

TMX Clearwater Camp Install

Mt. Merrick (Black Diamond CGL Installation)

Sioux Lookout Camp